Strengthening Modeling Capabilities in Graphical Model Editor (GMB)RailModeller Pro is a planning tool for designing model railroad and slot car layouts. Its intuitive, very easy operation, technically precise planning and the possibility to design your own track. Initially available as freeware, the track layout software Railroad-Professional quickly made a name for itself. Railroad-Professional is the software for your model railway and has been successfully on the market for over 20 years.Track pieces are automatically aligned to create. Designing a layout is as simple as dragging track from the catalog palette to the plan window. Empire Express harnesses the ease of use and power of the Mac so you can quickly, easily, and accurately design your model railroad empire.By considering couplings (defined by zero phase coupling or coupling data) as well as using the new earthing disconnector PSS®SINCAL provides new network modeling options for isolation and protection coordination.Protection Analysis - Pickup Security (PSA)The operating currents occurring in the network must not lead to the pickup of the protection systems, the protection devices must therefore be able to differentiate reliably between load and short-circuit current. Furthermore, induced currents and voltages occur in the switched-off lines, which have to be observed. Off this fully graphical software in the gauge of your choice and plan away.Improvement in Handling of Line Couplings and Extensions for Disconnected LinesIf parallel coupled lines are disconnected by events or for maintenance purposes and are optionally earthed at the terminals, it may have an impact on operation and protection of the active line. New functions, blocks and a completely revised functional documentation support users in creating user-defined models in GMB.RR-Track v5 is the answer for all your toy or model train layout design. PSS®SINCAL provides the possibility to implement different concepts of modern operation by simplified central and decentral model communication.
Train Layout Software Software For YourThe user interface of the module in PSS®SINCAL aligns closely to the user workflow and offers the consideration of pre-defined operating points (module LP) and additional parameter variations for reactive and active power to support the collaborative identification of the maximum power capacity at the connection node between planner and applicant.Aligned signal flow for element controllers, capability curves and limits (PF based modules)To allow the detailed modelling of common functionalities of decentral energy resources (DER) the existing sub-functions for elements in power flow based calculations are aligned and extended. These enhancements lead to a significantly increased efficiency in sharing a common network model.Revised Grid Connection Assessment Module for DERs (EEG) for DACH region guidelinesThe calculation and evaluation steps of the module to assess the grid connection guidelines are revised to the updated effective guidelines with respect to short-circuit power, equipment utilization, voltage changes, flicker and harmonics. In addition, the administrator is supported in managing the master network in such a way that changes in the publications of the users are highlighted in the preview of the network graphic. In the current version, the Multi-User Master Database is extended so that the administration can be opened directly without loading the network data and graphics, client users are automatically informed about updates in the Master Database when they open their network, and users can change their password without the intervention of the administrator. The Excel import dialog has been improved and adapted to the users workflow.Extension of the Multi-User Master Database (PM)When working with multiple users or teams on complex network models, certain requirements must be fulfilled in order to manage a common network model to track the changes of individual users and keep the network model consistent. Endless frontier emulator macThrough this stochastic approach, grid planners can save time through no longer needing to rely on trial and error approaches with hundreds of what if scenarios.Seamlessly link and manage external network equipment documentsEasily manage all your documents related to network equipment such as transformers or protection devices. This means that utilities can now understand how their networks will be affected over-time by the increasing penetration of EV charging stations or DER and identify future requirements for network enhancements. Distribution utilities will need to leverage state-of-the-art technologies in order to prepare their grids for the future.With the new PSS®SINCAL Network Stress Test module, distribution grid planners can easily simulate the current and future impacts of e-mobility or DER on their networks. Standard load flow studies will no longer be enough to ensure reliability. The grid will become more unpredictable as the connection points and magnitude of the e-car charging stations or DER are unknown, and the network load varies by time and location. ![]()
0 Comments
Leave a Reply. |
AuthorDavid ArchivesCategories |